Public EV Charging ROI Calculator (beta)

Take the guesswork out of your public EV charging investment with our free EV Charger ROI Calculator designed to model profitability, cashflow, and asset value over time.
This interactive tool helps site owners, developers, and investors understand the real return potential of installing fast-charging infrastructure.

The default values are based on a 120 kW dual output DC charger and can be adjusted accordingly. The calculator models realistic installation costs, operating expenses, and performance assumptions to give you a clear view of payback and long-term profitability.

Enexus supports customers at every stage of their charging project:

  • Supply of hardware solutions from leading European and Australian-certified manufacturers.

  • Referral to a trusted installation partner for site design and electrical works.

  • Access to a leasing partner offering highly competitive, finance-equivalent interest rates to simplify funding.

Use the calculator below to explore how factors such as daily utilisation, energy pricing, and financing terms influence the financial performance of your EV charging project and discover how Enexus can help you accelerate your path to net-zero transport.

Access the free Calculator

Sign In Sign Up

Signing up only takes 10 seconds

Your site

Change any value and the projection updates. All amounts AUD excluding GST.

Project cost
Finance
Charger and grid connection
Utilisation
Public DC sites typically start between 2 and 5 sessions a port each day.
Tariffs
Retail energy rate on your business tariff, excluding demand charges.
Network capacity charge on the grid import limit, billed every day whether or not anyone charges. 2026-27 published tariffs run from $0.23 (Energex, Ergon) to $0.60 (Ausgrid) a kW a day; Victorian 40-160 MWh sites sit near $0.45. kVA tariffs are close to kW for DC chargers.
Operating costs
Advanced and host arrangement

Cash position over time

Where each dollar of revenue goes

What moves the result

How busy does the site need to be?

Year by year

Keep this projection

Email yourself the year-by-year figures, or ask Enexus to look at the site with you.

Disclaimer. Default values and calculated results are a general guide only. Actual utilisation, operating costs and financial performance of public EV charging sites vary with location, site access, energy tariffs, driver behaviour and maintenance. Enexus makes no warranty or representation as to the accuracy or completeness of these estimates.